Finishing Touches
Nearly done! Okay actually there is still lots of things to do before we can say it's "finished", but it's mostly cosmetic, things that don't affect the running of the studio. So as for finishing touches we really are close to opening! We've had all our equipment in storage since before the start of the build so we're really excited to get it moved in. A date has been set and now the big parts of the build have been complete, we see no reason why we can't start moving everyt
Adam Crossley
Jun 22, 20182 min read


Studio Windows
The majority of the dusty work is done, so we've been working hard on the window between the control room and live room, or is that windows...? The studio walls and doors are complete and we had to make sure the the specification of the window was going to maintain the integrity of the acoustic system . Firstly the two rooms are almost entirely independent from each other, separated walls built on separated sub-floors; in trying to keep that separation each room has it's ow
Adam Crossley
Apr 29, 20182 min read


Putting On The Walls
So we are at a point with the studio build where multiple jobs are are running concurrently. The Rockwool is still going in, the electrical work has come leaps and bounds, the CCTV system is being installed, and the plasterboard is making its way on to the walls. The plasterboard is so large (1.2 x 2.4 metres) and so heavy (30kg per sheet) it's really easy to snap under its own weight. Panelling any of the ceiling needs at least two people. Chris has made really quick and
Adam Crossley
Jul 23, 20171 min read


Water In, Water Out
So after deciding to pass on installing a toilet, we thought we'd at least install a kitchen... Or at the very least prepare to install a kitchen. Remember when we toiled with the idea of installing a toilet? Well we scrapped the idea since there was a communal toilet right next to our unit, and it would have cost loads to install our own into the current waste system. Instead the studio will eventually have a small kitchen in the isolation corridor. However, we don't w
Adam Crossley
Apr 2, 20171 min read


Sub-Floor Construction
This week deliveries from 3 different suppliers came with the rest of the materials for the studio floor. Remember, we can't build directly onto the concrete so there is loads of work to do building in a sub-floor. We're squashed for workspace so we're prioritising the construction of the live room floor first, when that's done we can use that floor for extra workspace. The materials we are using: 4x2 Timber carcassing Adhesive high-density foam rubber isolation tape Fo
Adam Crossley
Mar 12, 20172 min read


ProRec and Unlimited partner for new recording studio in Manchester
ProRec Productions and Unlimited Productions have joined in partnership to bring a new recording studio to Manchester's music scene. It's taken 6 months of blood, sweat, and 16 revisions of a business plan to finally get a lease on a property for our new studio project, and we are finally in a position to begin the build. Our main mission in this project is to establish professional recording facilities in a more accessible way than ever. Not only are we building a new reco
Adam Crossley
Dec 3, 20161 min read