Putting On The Walls
So we are at a point with the studio build where multiple jobs are are running concurrently. The Rockwool is still going in, the electrical work has come leaps and bounds, the CCTV system is being installed, and the plasterboard is making its way on to the walls. The plasterboard is so large (1.2 x 2.4 metres) and so heavy (30kg per sheet) it's really easy to snap under its own weight. Panelling any of the ceiling needs at least two people. Chris has made really quick and
Adam Crossley
Jul 23, 20171 min read


Studwork Finished!
We are approaching the half-way point of the studio build. The project has come along way and there is still a mile to go. Momentum is building and we are so pleased with the work done so far. We have reached a milestone and the main timber structures that create the control room and live room are complete. Each timber frame was constructed on the floor and erected into place, with over 1000 screws holding the whole thing together! Our design incorporates 3 different ceilin
Adam Crossley
May 20, 20171 min read
GET IN TOUCH
Talk To Us
You can connect with us directly on WhatsApp and start a conversation about your studio needs.
bottom of page